110/20kV Transformer Substation for Teiuș PV Plant

We delivered a turnkey project for the 110/20 kV substation at Teiuș, built as the grid connection for the 60.2 MW Teiuș photovoltaic plant. The substation is equipped with an 80 MVA 110/20 kV power transformer, several 20 kV bays, a neutral grounding system, auxiliary services and reactive power compensation via a capacitor bank. Design […]

110kV Substation for Botiz PV Plant

We implemented a turnkey project for the Satu Mare 2 – Botiz photovoltaic plant (27 MWp), building the complete 110/20 kV substation together with the 20 kV underground line that connects it to the plant. The substation comprises a 110 kV bay, a 110/20 kV 31.5 MVA power transformer, several 20 kV bays, network neutral […]

132kV Substation for KJO (Saudi Arabia)

Khafji Joint Operations is a joint venture between Kuwait Gulf Oil Company and Aramco Gulf Operations Company, producing oil and gas both onshore and offshore. Through our licensed Saudi Arabian subsidiary, we were awarded the EPC contract for a new high-voltage substation supplying the KJO facilities — infrastructure on which continuous production directly depends.

MV Power Factor Capacitor Banks T&D

This project covered the design, procurement, installation, testing and commissioning of three capacitor banks totalling 7.5 MVAR, for three medium-voltage substations within the Ar Razi plant. The solution is built on ABB ABBACUS capacitor banks, selected to meet the plant’s technical and operational requirements. We also developed a new control system using National Instruments PLCs, […]

JU’AYMAH NGL FRACTIONATION ​Replacement of transformers in substation#32 (offshore) T&D

This project involved replacing and modernising critical electrical infrastructure at an offshore substation, with the aim of improving system reliability and operational performance. Our scope covered dismantling the existing transformers, procuring and installing new 4.16 kV units, upgrading the protection schemes, and carrying out testing and commissioning to ensure seamless integration and operational readiness.

MV & LV Switchgear Replacement T&D

The Plant II Substation of Ar Razi Saudi Methanol Company had four low-voltage MCCs that had reached the end of their 30-year life cycle and needed replacing with a modern supply solution. The medium-voltage switchgear, meanwhile, still relied on old electromechanical relays; these were replaced with new multifunctional protection relays to raise operational safety and […]

110/20kV Substation Retrofit of Tismana HPP

We delivered the retrofit of the 110/20 kV substation at Tismana Hydro Power Plant, covering the design, manufacturing, installation and commissioning of the new 110/20 kV switchgear. We were also responsible for designing and developing a new 110/20 kV SCADA system, and for integrating both the new and the existing protection relays into it.

SCADA for the 110/20 kV Mireasa Substation

This project covered the development and integration of a SCADA solution for the 110/20 kV substation, enabling the coordinated operation of several energy assets on one site. Our scope included integrating the first BESS phase — six 4 MWh units — over the IEC 60870-5-104 protocol, integrating the wind farm control system, and incorporating the […]

Turn-key refurbishment of 34.5kV GIS Substation and 2x50MVA Transformers

This project was a comprehensive modernisation of critical electrical infrastructure, aimed at increasing capacity, reliability and long-term operational performance. Our scope covered the replacement of two existing 30/40 MVA Siemens transformers with new 40/50 MVA units, modernisation of the GIS switchgear lineup with the latest Siemens technology, replacement of the 34.5 kV primary and 13.8 […]

220 kV Substation for Lerești HPP

Lerești HPP, a 42 MW hydropower plant on the Târgului river in central Romania, was refurbished by our team. We modernised the plant’s 20 kV substation and built a new 10 kV substation, complete with a new SCADA system. Scope of work: