132kV Substation for KJO (Saudi Arabia)

A new 132 kV substation in Saudi Arabia, delivered through our local subsidiary to secure the power supply for Khafji Joint Operations’ onshore and offshore oil and gas facilities.

Client:

Khafji Joint Operations

Voltage Level:

132kV

Operating since:

2024

Location:

Saudi Arabia

Khafji Joint Operations is a joint venture between Kuwait Gulf Oil Company and Aramco Gulf Operations Company, producing oil and gas both onshore and offshore.

Through our licensed Saudi Arabian subsidiary, we were awarded the EPC contract for a new high-voltage substation supplying the KJO facilities — infrastructure on which continuous production directly depends.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show