Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant developed in Arad County for UNIGEA Solar Projects. Completed in 2026, the PVPP adds a substantial block of new generating capacity to the Romanian grid. At 85.35 MWp, Helios is one of the largest photovoltaic plants in ENEVO Group’s Romanian portfolio.

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As General Contractor, we’ve carried the full EPC scope: engineering, procurement and construction were handled end to end by its own teams, from detailed design through to energisation, with every milestone met on precision, safety and long-term performance. Video Titu 54 MWp – Photovoltaic […]

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash disposal site south of the city — a marshy, acidified brownfield turned into a working renewable energy asset. Spread over 83 hectares, the PVPP has an installed capacity of 51.93 MWp and combines 85,000 LONGi photovoltaic modules with 170 Huawei inverters. As EPC […]

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems that follow the sun through the day to draw the maximum yield from every module. Annual output exceeds 103 GWh — enough clean electricity for more than 25,000 households. We led the EPC execution end to end: design, procurement, installation and commissioning of […]

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered under a full EPC contract for WOOD & Company and Solek Group. Our scope ran from detailed engineering and technology selection through procurement, construction, testing and commissioning, keeping every phase aligned and on schedule. The PVPP is built with Canadian Solar modules and […]

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after just eight months of construction. As EPC contractor we delivered the project on a lump-sum turnkey basis, covering full engineering, procurement and construction. Built for NEPI Rockcastle in collaboration with LONGi Solar Europe, it is the first PVPP to integrate LONGi’s Hi-MO 9 […]

Botiz PV Plant, 27 MWP

We delivered the Botiz Photovoltaic Park (27.055 MWp) under a full EPC contract covering both the photovoltaic power plant and its 110/20 kV transformer substation. The PVPP is built on fixed, south-oriented structures using GCL modules and Metalix mounting systems, with integrated medium-voltage stations, and produces more than 32,000 MWh of clean electricity a year. […]

Vrancart PV Plant, 20 MWp

The Vrancart project is a 20 MWp utility-scale photovoltaic installation built in Adjud under a full EPC contract for Vrancart SA. In operation since 2024, it combines Canadian Solar modules with Sungrow inverters to deliver dependable renewable generation and advance the client’s long-term sustainability commitments.

Vulturu PV Plant, 12 MWp

We delivered a 12 MWp photovoltaic power plant at Vulturu, in Vrancea County, for Electrica SA — adding new renewable capacity in a region with strong solar potential. The project confirms our ability to build utility-scale photovoltaic infrastructure efficiently and in line with the client’s technical and sustainability objectives.

Therme Bucharest PVPP, 2.51 MWp

The Therme project combines a 2.51 MWp photovoltaic installation with an integrated 0.8 MWh battery energy storage system, delivered for Therme MEP Bucharest under a full EPC contract. Completed in 2022, it brings together Powerway mounting structures, LONGi photovoltaic modules and Sungrow inverters. The addition of storage allows generated energy to be shifted to when […]