Giurgiu PV Plant, 51.93 MWp

A 51.93 MWp solar park in southern Romania that gives a degraded former industrial site a productive second life — a benchmark in ecological reconversion.

Client:

SIMTEL

Power:

51.93 MWp

Operating since:

2025

Location:

Giurgiu, Romania

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash disposal site south of the city — a marshy, acidified brownfield turned into a working renewable energy asset.

Spread over 83 hectares, the PVPP has an installed capacity of 51.93 MWp and combines 85,000 LONGi photovoltaic modules with 170 Huawei inverters. As EPC contractor we handled the complete design and implementation, adapting the engineering approach to difficult terrain and optimising the mounting configuration accordingly.

Delivered for SIMTEL, the project shows what integrated engineering can achieve in demanding conditions: underused industrial land converted into long-term clean energy generation.

Video Giurgiu 52MWp – Photovoltaic power plant

Gallery PV Giurgiu

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

Botiz PV Plant, 27 MWP

We delivered the Botiz Photovoltaic Park (27.055 MWp) under a full EPC ...

No more posts to show