We delivered the Botiz Photovoltaic Park (27.055 MWp) under a full EPC contract covering both the photovoltaic power plant and its 110/20 kV transformer substation.
The PVPP is built on fixed, south-oriented structures using GCL modules and Metalix mounting systems, with integrated medium-voltage stations, and produces more than 32,000 MWh of clean electricity a year.
Our scope included engineering, procurement, construction, testing and commissioning, ensuring full compliance with grid standards and a seamless connection into the national network.
With the photovoltaic plant and its 110/20 kV substation delivered under one contract, ENEVO Group was accountable from module to grid, rather than handing the connection over to a second contractor.