With 68.99 MW of installed capacity, the Teiuș park uses tracking systems that follow the sun through the day to draw the maximum yield from every module. Annual output exceeds 103 GWh — enough clean electricity for more than 25,000 households.
We led the EPC execution end to end: design, procurement, installation and commissioning of the photovoltaic power plant, a 110/20 kV substation and an 80 MVA transformer station, all built to the highest quality standards and in full compliance with Romanian grid connection regulations.
Delivering both the generating plant and the substation that connects it means a single contractor is accountable from module to grid, with no interface gaps between generation and connection.
The PVPP was officially inaugurated in April 2025.