110kV Substation for Botiz PV Plant

The 110/20 kV substation and 20 kV underground line that connect Electrica’s 27 MWp Botiz PV plant to the national grid, delivered turnkey.

Client:

Electrica

Voltage Level:

110kV

Operating since:

2024

Location:

Botiz, Satu Mare County, Romania

We implemented a turnkey project for the Satu Mare 2 – Botiz photovoltaic plant (27 MWp), building the complete 110/20 kV substation together with the 20 kV underground line that connects it to the plant.

The substation comprises a 110 kV bay, a 110/20 kV 31.5 MVA power transformer, several 20 kV bays, network neutral treatment, auxiliary services and reactive power compensation with a capacitor bank.

Civil works, primary equipment, protection and SCADA systems were all designed in house by our own engineering team.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show