We delivered a turnkey project for the 110/20 kV substation at Teiuș, built as the grid connection for the 60.2 MW Teiuș photovoltaic plant.
The substation is equipped with an 80 MVA 110/20 kV power transformer, several 20 kV bays, a neutral grounding system, auxiliary services and reactive power compensation via a capacitor bank.
Design and execution of both primary and secondary circuits, protection systems and SCADA were carried out entirely in house, alongside equipment procurement, civil works and erection. The SCADA system was integrated with the PV plant’s own SCADA, Transelectrica’s EMS and Electrica’s DMS.
The project closed with the installation, testing and commissioning of the complete substation infrastructure.