We delivered the retrofit of the 110/20 kV substation at Tismana Hydro Power Plant, covering the design, manufacturing, installation and commissioning of the new 110/20 kV switchgear.
We were also responsible for designing and developing a new 110/20 kV SCADA system, and for integrating both the new and the existing protection relays into it.