Turn-key refurbishment of 34.5kV GIS Substation and 2x50MVA Transformers

Two transformers uprated from 30/40 to 40/50 MVA and a complete GIS switchgear upgrade, all commissioned inside a ten-day plant shutdown window.

Client:

Siemens Energy

Voltage Level:

34.5/13.8kV, 2x50MVA

Location:

Sibiu, Romania

This project was a comprehensive modernisation of critical electrical infrastructure, aimed at increasing capacity, reliability and long-term operational performance.

Our scope covered the replacement of two existing 30/40 MVA Siemens transformers with new 40/50 MVA units, modernisation of the GIS switchgear lineup with the latest Siemens technology, replacement of the 34.5 kV primary and 13.8 kV secondary power cables, and the associated civil and erection works.

The project culminated in a critical ten-day commissioning window, executed during a planned plant shutdown.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show