This project covered the development and integration of a SCADA solution for the 110/20 kV substation, enabling the coordinated operation of several energy assets on one site.
Our scope included integrating the first BESS phase — six 4 MWh units — over the IEC 60870-5-104 protocol, integrating the wind farm control system, and incorporating the Monsson-designed BESS cooling system with its temperature, pressure and flow transmitters and digital switches.
We then developed joint control logic for the wind farm and the battery storage system together, and completed full conformity testing to confirm operational readiness and compliance.