SCADA for the 110/20 kV Mireasa Substation

A SCADA system that brings a wind farm and a battery storage plant under joint control at the 110/20 kV Mireasa substation.

Client:

Monsson

Power:

110/20kV

Location:

Mireasa, Constanța County, Romania

This project covered the development and integration of a SCADA solution for the 110/20 kV substation, enabling the coordinated operation of several energy assets on one site.

Our scope included integrating the first BESS phase — six 4 MWh units — over the IEC 60870-5-104 protocol, integrating the wind farm control system, and incorporating the Monsson-designed BESS cooling system with its temperature, pressure and flow transmitters and digital switches.

We then developed joint control logic for the wind farm and the battery storage system together, and completed full conformity testing to confirm operational readiness and compliance.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show