JU’AYMAH NGL FRACTIONATION ​Replacement of transformers in substation#32 (offshore) T&D

Replacement of the 4.16 kV transformers and an upgrade of the protection schemes at Substation #32 of the Ju’aymah NGL fractionation plant, offshore.

Voltage Level:

4.16kV

Location:

Ju'aymah NGL Fractionation Plant (offshore), Saudi Arabia

This project involved replacing and modernising critical electrical infrastructure at an offshore substation, with the aim of improving system reliability and operational performance.

Our scope covered dismantling the existing transformers, procuring and installing new 4.16 kV units, upgrading the protection schemes, and carrying out testing and commissioning to ensure seamless integration and operational readiness.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show