Therme BESS, 0.8MWh

A 0.8 MWh battery paired with on-site solar at Therme Bucharest, cutting peak demand and raising the share of renewable energy the site consumes itself.

Client:

Therme MEP

Power:

0.8 MWh

Location:

Bucharest

A 0.8 MWh battery energy storage system built around CATL cells was integrated into the Therme site to enable energy shifting, peak shaving and greater energy security for the facility.

Working together with the on-site photovoltaic plant, storage increases the share of renewable energy consumed on site, reduces dependence on the grid and helps bring operating costs down.

The project was delivered with high-quality components throughout, with efficiency, operational performance and long-term reliability as the guiding criteria.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...