PORT VI 110/20kV GIS Substation and Constanța Port VI Energy Dispatch Center

A new 110/20 kV GIS substation and an energy dispatch centre that bring the whole of Constanța Port’s electrical network under a single point of control.

Client:

Maritime Ports Administration SA

Voltage Level:

110/20kV

Operating since:

2024

Location:

Constanța, Romania

As part of a consortium with Siemens Energy, we were responsible for the design and engineering of the new 110/20 kV GIS substation and the medium-voltage transformer substation serving the entire Constanța Port facility.

The objective was to modernise and centralise the port’s energy infrastructure, giving operators a single platform for monitoring, control and operation across all key areas.

Our scope covered protection and SCADA panels, medium-voltage protection relays and a full substation SCADA system for real-time monitoring and control. A new energy dispatch centre was established to oversee the wider energy network and improve operational coordination.

The dispatch centre integrates every major infrastructure node — the 110 kV substations at PORT III, PORT IV and PORT VI, together with the medium-voltage transformer substations — enabling centralised supervision of the port’s electrical infrastructure.

Services provided: design and engineering, protection and SCADA implementation, dispatch centre integration, testing and commissioning.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show