Nehoiașu HPP is a 42 MW hydropower plant on the Buzău River in central-eastern Romania, refurbished by our team.
The work centred on revamping the 20 kV substation: new medium-voltage switchgear, new protection and metering systems, and a new 110/20 kV SCADA system.
We carried out the basic and detailed engineering, managed procurement of the MV switchgear and designed the SCADA and protection systems. The team also configured the protection relays, ran factory and site acceptance testing, and closed the project with the installation, testing and commissioning of all systems.