20kV Substation for Nehoiasu HPP

A refurbishment of the 20 kV substation at the 42 MW Nehoiașu hydropower plant, with new medium-voltage switchgear, protection systems and a new SCADA.

Client:

Hidroelectrica

Voltage Level:

42MWp

Operating since:

2022

Location:

Buzău County, Romania

Nehoiașu HPP is a 42 MW hydropower plant on the Buzău River in central-eastern Romania, refurbished by our team.

The work centred on revamping the 20 kV substation: new medium-voltage switchgear, new protection and metering systems, and a new 110/20 kV SCADA system.

We carried out the basic and detailed engineering, managed procurement of the MV switchgear and designed the SCADA and protection systems. The team also configured the protection relays, ran factory and site acceptance testing, and closed the project with the installation, testing and commissioning of all systems.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show