Doicești BESS, 15 MWh

A 15 MWh battery system at Doicești, giving Silmaril the flexibility to manage its own consumption and respond to price and grid signals.

Client:

Silmaril

AC Power:

10.35 MWp

DC Capacity:

15 MWh

Operating since:

2025

Location:

Doicești

Doicești BESS is a 15 MWh battery energy storage project developed for Silmaril, with 10.35 MW of installed AC power.

Currently under delivery, the system will improve energy flexibility and operational efficiency on site, while adding a fast-responding resource that supports the reliability of the wider network.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show