Tușnad BESS, 22.5MWh

A 22.5 MWh battery storage project in Tușnad that lets Silmaril store surplus energy and release it back when the grid needs it most.

Client:

Silmaril

AC Power:

10.35 MWp

DC Capacity:

22.5 MWh

Operating since:

2025

Location:

Tușnad

Tușnad BESS is a 22.5 MWh battery energy storage project built for Silmaril, with 10.35 MW of installed AC power.

Currently under delivery, the system will allow energy to be shifted across the day, respond quickly to grid signals and keep output stable — capabilities that grow more valuable as variable renewable capacity increases.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...