Crucea Nord BESS, 72 MWh

At 72 MWh, one of the larger storage systems now being built in Romania, giving Hidroelectrica extra capacity to balance the national grid.

Client:

Hidroelectrica

AC Power:

36 MWp

DC Capacity:

72 MWh

Operating since:

2026

Location:

Crucea Nord

Crucea Nord BESS is a 72 MWh battery energy storage project developed for Hidroelectrica, with 36 MW of installed AC power.

Currently under delivery, the system is sized for grid balancing at scale: absorbing surplus generation, releasing it back at peak, and smoothing the intermittency that comes with a rising share of wind and solar in the mix.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show