230/34,5/13,8kV MSS1 Substation in Hadeed

A full rehabilitation of the protection, control and SCADA systems at Hadeed’s 230 kV GIS substation, carried out in house by our Saudi Arabian team.

Client:

Hadeed (Saudi Iron and Steel Company)

Voltage Level:

230/34,5/13,8kV

Operating since:

2023

Location:

Hadeed, Saudi Arabia

Our Saudi Arabian team, ENEVO Arabia, carried out a comprehensive rehabilitation of the protection and control systems for the 230 kV GIS substation and the medium-voltage switchgear in MSS1.

The aim was to replace ageing infrastructure and lift the reliability and performance of the substation’s control systems — from relay replacement and panel upgrades through to system integration and commissioning.

The scope covered new LCC and protection panels, and the replacement of existing protection relays for the 34.5 kV MSS1, the 13.8 kV MSS1 and the 13.8 kV DR A/B/C feeders. A new SCADA system was deployed on SICAM PAS and SICAM SCC, and the substation was integrated with the main dispatch centre via SIEMENS SPECTRUM, giving centralised monitoring and coordination of the electrical network.

Design, installation, testing and commissioning of the protection, control and SCADA systems were all delivered in house.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show