Gogosu Dam Retrofitting

ENEVO Group was the main automation contractor for the refurbishment of the Gogosu Dam,delivering a tailored automation solution for the control of seven radial gates and two hydraulic units. The project involved the design and implementation of a comprehensive automation system, including configuration of protection relays and substation control. A dedicated communication network was designed […]

SCADA for the 110/20 kV Mireasa Substation

This project covered the development and integration of a SCADA solution for the 110/20 kV substation, enabling the coordinated operation of several energy assets on one site. Our scope included integrating the first BESS phase — six 4 MWh units — over the IEC 60870-5-104 protocol, integrating the wind farm control system, and incorporating the […]

PORT VI 110/20kV GIS Substation and Constanța Port VI Energy Dispatch Center

As part of a consortium with Siemens Energy, we were responsible for the design and engineering of the new 110/20 kV GIS substation and the medium-voltage transformer substation serving the entire Constanța Port facility. The objective was to modernise and centralise the port’s energy infrastructure, giving operators a single platform for monitoring, control and operation […]

230/34,5/13,8kV MSS1 Substation in Hadeed

Our Saudi Arabian team, ENEVO Arabia, carried out a comprehensive rehabilitation of the protection and control systems for the 230 kV GIS substation and the medium-voltage switchgear in MSS1. The aim was to replace ageing infrastructure and lift the reliability and performance of the substation’s control systems — from relay replacement and panel upgrades through […]