ENEVO Group was the main automation contractor for the refurbishment of the Gogosu Dam,
delivering a tailored automation solution for the control of seven radial gates and two hydraulic units.
The project involved the design and implementation of a comprehensive automation system, including configuration of protection relays and substation control. A dedicated communication network was designed to enable seamless integration of the new system into the existing dispatch infrastructure, supporting centralized monitoring and control.
The scope also included performing both Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) to validate the solution and ensure successful commissioning.
ENEVO Group was also responsible for:
- Designing and implementing a comprehensive automation solution.
- Configuring protection relays and substation design.
- Designing the communication network for seamless integration.
- Incorporating the new system into the existing dispatch infrastructure.
- Performing the Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT).