DCS System for Stejaru Hydro Power Plant (210 MW)

A modernised DCS architecture at a 210 MW hydropower plant, structured from the start to carry continuous OT cyber monitoring.

Client:

Hidroelectrica

Power:

210 MW

Location:

Stejaru, Neamț County, Romania

Scope: lead automation contractor for the DCS modernisation of the 210 MW Stejaru hydropower facility on the Bistrița River — six turbines, roughly 500 GWh of annual generation.

Deliverables:

  • Modernised DCS architecture
  • Foundations for OT cybersecurity through segmentation, asset visibility and configuration management
  • Integration with wider plant operations

Outcome: a modernised control architecture inside a long-life critical asset, structured so that continuous OT cyber monitoring follows on naturally.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show