SCADA & Automation Modernization – Artrom Steel

Power:

MWp

Project Overview: Successfully delivered a modernized automation system for Artrom Steel, migrating from ABB PLC and DCS800 to a Siemens S7-1500 PLC-based control system with WinCC monitoring and control applications.

Key Deliverables

Control System Upgrade: Migration to Siemens S7-1500 PLC, replacing legacy ABB PLC and DCS800.

Hardware Installation: Delivered 1 SCADA cabinet and 5 fully equipped control cabinets, integrating a central CPU and 5 remote I/O units with a total of 2432 digital inputs, 1664 digital outputs, 144 analog inputs, and 36 analog outputs.

Command Room Setup: With SCADA Server, Historian Servers and Operation clients.

System Replacement: Included dismantling of existing control cabinets.

Project Impact: Enhanced Control & Monitoring – Upgraded to a modern PLC-based control system with WinCC SCADA. Optimized System Performance – More efficient control of industrial processes. Future-Ready Infrastructure – Scalable system ready for further expansion.

This project showcases our expertise in automation modernization and control system upgrades, delivering enhanced efficiency and reliability for industrial applications.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show