Replacement of the critical ESD System Switches with Transmitters

Shutdown-critical switches replaced with transmitters across three gas-oil separation plants, with matching DCS and TRICONEX updates.

Client:

Saudi Aramco

Power:

MWp

Location:

Saudi Arabia

This project involved upgrading critical Emergency Shutdown System (ESD) switches with transmitters at AinDar GOSP-2, AinDar GOSP-3 and Shedgum GOSP-6, improving plant safety, reliability and the secure operation of shutdown-critical systems.

Scope of work:

  • Design and implementation of the instrumentation replacement
  • Fabrication and installation services
  • Instrumentation configuration
  • DCS update
  • TRICONEX system update

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...