National Grid Substation Cyber Baseline

SentryOT deployed across national grid substations, with asset and topology mapping down to Level 0 and continuous monitoring from the OmniSOC.

Sector:

Power transmission

Scope:

SentryOT deployment, asset and topology mapping, continuous monitoring

Coverage:

Selected national grid substations, mapped down to Level 0

Status:

Ongoing

Scope: a cybersecurity baseline deployment across selected national grid substations, implementing the SentryOT Cyber Resilience Platform on the OT power and automation systems identified in the TSO transformation plan.

Deliverables:

  • SentryOT platform deployed per station
  • Asset inventory and topology mapping down to Level 0
  • Integration into the OmniSOC for continuous monitoring

Outcome: operational cyber resilience at substation level, generating the continuous evidence needed for supervisory and audit obligations.

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show