Modernization of the SCADA system in the Olt River hydropower development

Client:

Hidroelectrica

Power:

220 kV/400 kV

Location:

Lower Olt, Middle Olt, Upper Olt River, Romania

The purpose of the project is the implementation of a new SCADA solution in each of the 26 hydropower plants belonging to the Olt River hydropower development (Lower Olt, Middle Olt, Upper Olt).

This unified approach will enable interconnection within the National Power System’s operational control structures, ensuring uniformity in information exchange and transmission formats, as well as in maintenance and service activities.

Start Date: Oct. 2025 – End Date: Oct. 2027

See other projects

Helios PV Plant, 85.35 MWp

Helios PVPP is an 85.35 MWp / 72 MW photovoltaic power plant ...

Titu PV Plant, 54.23 MWp

We’ve delivered the Titu -54.23 MWp photovoltaic project in Dâmbovița County. As ...

Giurgiu PV Plant, 51.93 MWp

The Giurgiu Photovoltaic Power Plant was built on a former industrial ash ...

Teius PV Plant, 70MWp

With 68.99 MW of installed capacity, the Teiuș park uses tracking systems ...

Gogosu PV Plant, 42MWp

The Gogoșu photovoltaic project is a 41.94 MWp utility-scale solar installation delivered ...

Chisineu-Cris PV Plant, 54 MWp

The Chișineu-Criș Photovoltaic Power Plant (54.11 MWp) was completed and energised after ...

No more posts to show